Yarra Honda
The Ardent Architects team designed and delivered this project while in another role. The building started as a 2 storey secure data building for Coles Myer. The design added another two levels to the building and car lifts to move cars between the levels.
Yarra Honda was one of the first car dealerships to have used cars on the roof due to the limited size of the block and council requirements to build to the boundary.
The workshop is on the first floor with customer cars stored on the second floor.